View more
Zepoch Logo White
Contact
info@zepoch.ioLugano, Switzerland
Language
Status
online

accepting_projects · lugano_ch

© 2026 Zepoch Sagl

Services
Industrial·3-12 months

Industrial Software

MES, WMS, machine data, traceability and dashboards rolled out in phases for real factory and warehouse work.

Timeline3-12 months
Stack
PythonNode.jsOPC UAMQTT
01

About

Pilot before rollout

Industrial software should not start as a giant replacement program. We pick one line, machine group, warehouse flow or quality routine, connect the useful data, test it with operators and expand only when the system is trusted.

Built for plant-floor constraints

The work accounts for uptime, network limits, barcode flows, operator adoption, fallback procedures, ERP ownership and data accuracy. It is software around operations, not a replacement for PLC safety systems.

Where it fits

Useful entry points include MES visibility, WMS workflows, machine dashboards, stock movement tracking, quality checks, label printing, Odoo connectors, legacy system gaps and exception alerts.

02

Features

01

Pilot-to-production rollout

Start with one line, warehouse flow or operator task, then expand once the team trusts the system.

02

Machine, barcode and ERP data

Connect OPC UA, Modbus, MQTT, barcode flows, warehouse events and ERP records where they add operational value.

03

Plant-floor reliability

Design for network limits, fallback work, operator adoption, uptime, data accuracy and maintenance.

04

Proof from working systems

ARACNE, ZAMA, Consumi and Dual Label show factory visibility, WMS/ERP, Odoo-linked calculations and shop-floor automation.

03

Examples

Example 01

Industrial Pilot

A pilot around one line, machine group, or warehouse flow before wider MES/WMS rollout, with data collection and operator feedback.

Machine, barcode, or ERP data connection
Production or warehouse flow tracking
Basic operational KPI dashboards
Operator interface for the pilot flow
Inventory management
Quality control workflow

Timeline: 4-10 weeks

Example 02

Industrial Rollout

A production MES/WMS or industrial workflow system with multi-line support, inventory, traceability, dashboards, support, and handover.

Multi-line or multi-flow operations control
Inventory and warehouse workflows
Traceability and quality checkpoints
OPC UA, scanner, ERP, or database integration
Shift, resource, and support model

Timeline: 3-9 months

04

Selected Work

Ready to start?

Send the task, tools, data, approvals and outcome you need.